muninnhuginn: (Default)
[personal profile] muninnhuginn

A fortnight in (i.e. phase one supposedly finished), we have wall and some of the piers for the bay, plus window frames in place (as opposed to the four days where the frames occupied all the free floor and wall space in the hall and living room, during which time I hugged them a lot [beautiful frames of the same design as the broken ones, made to fit, with all the detailing repeated, thanks to the man from Diss (never diss dis man from Diss)]). Many problems with fitting things together and more rebricking being required-hence much of the delay. Also the lateness of windowsills cost half a day at least. Glass and glazier arrive today. I've taken, possibly a little early, nostalgic photos of the partition in the living room and the TV nest. And when it's down, most of the plastering is already done.


Must measure up for net curtains real soon.

This account has disabled anonymous posting.
(will be screened if not validated)
If you don't have an account you can create one now.
No Subject Icon Selected
More info about formatting

If you are unable to use this captcha for any reason, please contact us by email at support@dreamwidth.org

Profile

muninnhuginn: (Default)
muninnhuginn

September 2025

S M T W T F S
 123456
789 10111213
14151617181920
21222324252627
282930    

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Sep. 11th, 2025 08:02 am
Powered by Dreamwidth Studios