The Long, Slow Shuffle of Progress
Dec. 12th, 2005 11:57 am![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
A fortnight in (i.e. phase one supposedly finished), we have wall and some of the piers for the bay, plus window frames in place (as opposed to the four days where the frames occupied all the free floor and wall space in the hall and living room, during which time I hugged them a lot [beautiful frames of the same design as the broken ones, made to fit, with all the detailing repeated, thanks to the man from Diss (never diss dis man from Diss)]). Many problems with fitting things together and more rebricking being required-hence much of the delay. Also the lateness of windowsills cost half a day at least. Glass and glazier arrive today. I've taken, possibly a little early, nostalgic photos of the partition in the living room and the TV nest. And when it's down, most of the plastering is already done.
Must measure up for net curtains real soon.